Austria
Croatia
Germany
Luxembourg
Switzerland
- SPIE Germany Switzerland Austria (SPIE GSA) : expansion of a substation including the implementation planning and realization, the expansion of a 380 kV outdoor switchgear and the construction of a new 220 kV GIS switchgear including building, primary and secondary technology, lightning protection and earthing system, on behalf of Austrian Power Grid AG
- SPIE Germany Switzerland Austria (SPIE GSA) : expansion of substation, primary and secondary technology (third expansion stage); engineering, delivery, installation, commissioning of a 110 kV switchgear extension incl. documentation; production/installation/commissioning of control cabinets, electrical installation of switch house, as well as lightning protection, earthing system, steel construction, system cabling/piping, on behalf of EVN AG
- ARGEA (SADE) : various network replacement works and connections in Brussels as part of works on the sewerage network, on behalf of Vivaqua
- ARGEA (SADE) : construction of a 1,000 m³ reinforced concrete water tower in the city of Jodoigne, on behalf of the Société Wallonne des Eaux (SWDE)
- ARGEA (SADE) : various works on the drinking water production and distribution networks in Charleroi, on behalf of the Société Wallonne des Eaux (SWDE)
- ARGEA (SADE) : rehabilitation of 1.6 km of pipes by lining, 1.4 km by bursting and 3.1 km by installing GRP shells, as well as the replacement of 207 home connections, as part of the sewerage works in the municipalities of Mons and Ninove, on behalf of Vivaqua
- ARGEA (SADE) : various works to install and connect gas, electricity and public lighting in Brussels, on behalf of Sibelga
- ARGEA (SADE) : construction of the Thorembais-Saint-Trond wastewater treatment plant in the city of Perwez
- ARGEA (SADE) : rehabilitation of the sewer under Rue de la Victoire in Saint-Gilles, on behalf of Vivaqua. The contract includes the installation of shells, the lining of the sewer, the cementing of the walls of the collector and the rebuilding of the connections
- Eiffage Benelux (EIFFAGE) : design, build and maintain contract for the new Defence headquarters on an 11.4-hectare site, in Brussels. The new high-security site, comprising several buildings, will accommodate almost 4,000 Defence staff
- Eiffage Benelux (EIFFAGE), in a consortium : Josaphat project (Phase 1A) in Schaerbeek for the construction of 509 homes, distributed as follows: 246 private homes and 263 public homes, including 135 social rental homes, 105 mid-range homes and 23 social homes for purchase over an area of around 4 ha. The project includes more than 2.3 ha of landscaped public spaces (including 6 ha of park areas)
- Eiffage Énergie Systèmes (EIFFAGE) : recharging stations contract for Bpost (Belgian company handling postal mail and managing post offices)
- SPIE Belgium (SPIE) : 60 MW Hélios solar park for INEOS Inovyn production site, HV connection with Inovyn and interconnection with the solar park, on behalf of Perpetum Energy
- SPIE Belgium (SPIE) : maintenance contract cooling and ventilation, on behalf of Belgoprocess
- SPIE Belgium (SPIE) : new hospital, HVAC, on behalf of Picardy Wallonia Hospital Center CHwapi
- SPIE Belgium (SPIE) : renovation of dynamic tunnel signalisation on highway E40-E42 connection, on behalf of SPW Sofico
Croatia
- Bouygues Travaux Publics (Bouygues Construction) : located in North-Western Croatia, on the Istrian peninsula, the Istria motorway (2B2 and 2B3 packages) project aims to develop the region's economy by improving mobility through the doubling of the peninsula's entire motorway network. The project also aims to open up the peninsula and enhance the region's appeal as a tourist destination
- Bouygues Bâtiment International (Bouygues Construction) : construction of a sanatorium for medical rehabilitation care in Pasohlavky for patients who have been stabilized following a critical condition. The medical institute will offer 210 beds and aims to become a major institution in the region
- Colas Cz (COLAS) : construction of a new section of the I35 between Lesna and Palacov, in the East of the country
- Destia (COLAS) : maintenance contract for the railway network in the Southeast of the country
- Destia (COLAS) : construction and commissioning in Jylkka, near Kalajoki, of the first 400/110 kV synchronous condenser in Finland for Fingrid, the national energy transmission network operator
- Destia (COLAS) : construction of a transmission line (400/110 kV), about 82 km, near Kuopio, in Northern Savonia, in the East of the country
Germany
- Cobra IS (groupe VINCI) : in a consortium, contract to design, build and install the LanWin1 and LanWin3 offshore windfarm energy converter platforms in the North Sea, with a total capacity of 4 GW, on behalf of Amprion Offshore. The converter platforms will collect the alternating current generated by several wind farms and convert it into high voltage direct current (HVDC), which will then be reconverted into alternating current at onshore stations, approximately 400 km away. The onshore stations are also covered by the contract
- Cobra IS (groupe VINCI) : in a consortium with Siemens Energy, contract to design, build and install three wind-farm energy converter platforms in the North Sea, for the Dutch-German transmission system operator TenneT. With a total capacity of 6 GW, the converter platforms will collect the alternating current generated by several wind farms and convert it into high voltage direct current which will then be reconverted into alternating current at onshore stations approximately 200 km away, in the German towns of Wilhelmshaven and Heide
- Eiffage Infra-Bau (EIFFAGE) : Bonn Carree Nassestraße, building complex for Studierendenwerk, University of Bonn
- Elomech (Eiffage Énergie Systèmes, EIFFAGE) : offices and laboratories for BioNTech SE
- SEH (Eiffage Métal, EIFFAGE), lead contractor : construction of a new 688m-long, 2x4-lane bridge over the Rhine to replace an existing structure. The future bridge is located on the route of the A1 motorway and will link Leverkusen and Cologne. SEH will be responsible for demolishing the existing steel structure, completing 25% of the manufacturing of the new metal structure, corrosion protection and assembling all the steelwork and the structure’s cables. The metal components, representing over 16,000 tonnes of steel in total, will be manufactured in Germany and delivered by waterway via the Rhine
- SEH (Eiffage Métal, EIFFAGE) : upgrading of the Mülheim bridge, including installation of a 500-tonne auxiliary structure to secure the 750-tonne replacement railbed, dismantling of the old surface and slabs, and construction and installation of the new slabs
- Smuders (Eiffage Métal, EIFFAGE) : EPCI contract for the offshore substations for the Gennaker 1 and 2 wind farms (2 contracts), in the German Baltic Sea, including jackets
- SPIE Germany Switzerland Austria (SPIE GSA) : new construction of a supply network in South Germany as part of a 5-year framework agreement (end of 2027), on behalf of E.ON SE Bavarian Networks
- SPIE Germany Switzerland Austria (SPIE GSA) : new construction of 50 masts (19.2 km) including the dismantling of existing masts, roads and foundations works, supply of masts, steel and cable lying (with underground cable), on behalf of TenneT TSO
- SPIE Germany Switzerland Austria (SPIE GSA) : TechFM at a 600,000 sqm Mercedes production site including operational management, maintenance, inspection, breakdown service
- SPIE Germany Switzerland Austria (SPIE GSA) : additional contract to an existing one for an Amazon logistics and sortation fulfillment center, for a period of 36 months: TechFM, several services, in particular property management services, maintenance, inspection, testing and repair
- SPIE Germany Switzerland Austria (SPIE GSA) : new construction of a 380 kV line (27 pylons, approx. 10 km) including road construction and erection of the foundations, steel construction and erection of the pylons, erection of temporary structures, cable laying including underground cable and dismantling of two existing pylons, on behalf of TenneT TSO
- SPIE Germany Switzerland Austria (SPIE GSA) : renewal and modernization of tunnel technology (traffic light systems) and associated networks, in South Germany, on behalf of Die Autobahn GmbH des Bundes
- SPIE Germany Switzerland Austria (SPIE GSA) : broadband expansion in East Germany over 20 months as general contractor with the construction of a passive FTTH-broadband network including planning of design, approval and implementation; 68 km civil engineering, including laying empty conduits and cables; installation of fibre optic (laying and installation of around 1,151 house connections), on behalf of Eins Energie GmbH
- SPIE Germany Switzerland Austria (SPIE GSA) : tunnel exit services around technical tunnel equipment (services for communication lines) on behalf of the German Unity Motorway Planning and Construction (DEGES, Deutsche Einheit Fernstraßenplanungs- und Bau GmbH)
- SPIE Germany Switzerland Austria (SPIE GSA) : new tunnel construction to extend the metro line network in the city of Nuremberg (including 3 km underground), including two stations with the supply of the electrotechnical equipment of the subway stations and tunnels, fire alarm systems and telecommunications equipment
- SPIE Germany Switzerland Austria (SPIE GSA) : security solutions, maintenance and servicing for 48 months, Lot 1 (intrusion detection & escape route technology, hazard management system) and Lot 2 (video surveillance), on behalf of the public transport services of Berlin (Berliner Verkehrsbetriebe)
- SPIE Germany Switzerland Austria (SPIE GSA) : installation of telecoms and IT infrastructure for the Karlsruhe municipal hospital (90 km data line, 644 Cisco access points, 20 Cisco PoE switches 48 Port, 1,400 passive data ports CU)
- Bouygues Bâtiment International (Bouygues Construction) : construction of the « Riviera » tower on the site of the former Athens airport. This contract is part of the Ellinikon project, the largest urban regeneration plan in Europe. Comprising 49 floors, or a height of around 200 m, the tower will include 169 residential units, 2 levels of parking, spa, gym and indoor swimming pool. The tower's biophilic architecture will aim to promote harmony between the landscape and the structure
- Eiffage Génie Civil (EIFFAGE), in a consortium : civil engineering and track-laying contract for the approximately 230-kilometre Latvian section of the new Rail Baltica high-speed rail line. The contract includes 175 engineering structures and 11 wildlife crossings. This line has been designed to integrate the Baltic States into the European rail network, with the creation of a link between Helsinki (Finland) and Warsaw (Poland)
Luxembourg
- Tralux Construction (DEMATHIEU-BARD) : construction of a new transformer station in the Kirchberg district of Luxembourg, including the closed structural work with metal cladding, networks and exterior fittings, ironwork, the overhead crane, and interior finishing work
- Tralux Construction (DEMATHIEU-BARD) : reconstruction of the OA265 Emile Hammerel in Bettembourg, including the demolition of the Hammerel bridge (a curved prestressed concrete bridge dating from 1975) and the construction of a new bow-string type structure entirely made of metal, reducing the number of piles as well as the rehabilitation of the 80 ml access ramp to the structure, the construction of 2 reinforced concrete abutments on either side of the structure, the construction of 3 mixed reinforced concrete/steel piles, and the redevelopment of the roadway at the abutments
- Tralux Construction (DEMATHIEU-BARD) : Howald interchange hub, lot 2b Howald platform (phase b), creation of a second tramway track as part of the development of the Howald district, in order to connect it to Ban de Gasperich. The Tralux Construction teams, responsible for the first part of the structure overlooking Howald station in 2022 and 2023, are now carrying out the extension of this structure (approximately 33 m), a mixed bridge with prefabricated metal beams, 70 m long and 50 m wide
- Tralux Construction (DEMATHIEU-BARD) : construction of section E of a tram line in Luxembourg, connecting the storage and maintenance center to the Airport terminus. It is approximately 3.6 km long and includes 2 stations
- Tralux Construction (DEMATHIEU-BARD) : extension of the existing school complex in Reuler. The project includes the construction of a school, a daycare center, and a nursery, covering a total area of 13,000 m²
- Tralux Construction (DEMATHIEU-BARD) : construction of a school in Bettembourg, with an area of 13,544 m², including a sports hall, 3 fields, 18 classrooms, a production kitchen with a capacity of 400 meals, and an underground parking lot with 50 spaces
- Tralux Construction (DEMATHIEU-BARD) : Howald peripheral station (phase 2) including civil engineering and technical engineering works with the aim of creating a second platform and platform works at Howald station, including numerous railway infrastructure works and redevelopment of the marshalling yard and a railway bundle
- Tralux Construction (DEMATHIEU-BARD) : construction of the new railway platform at the north end of Bettembourg station following a phased railway schedule (contract 4c). The contract includes the drilling of rigid inclusions and micropiles, earthworks, platform leveling, and acoustic
- Tralux Construction (DEMATHIEU-BARD) : construction of the new headquarters of Société Générale in Luxembourg (gross floor area: 11,570 m²). The building will consist of two basement levels (technical rooms and storage, a fitness area, a business center, and a 254-seat auditorium), a garden level and a ground floor with offices and a trading room, as well as six office floors
- Tralux Construction (DEMATHIEU-BARD) : construction of a concrete structure (26 m high and 20 m in diameter) with a cylindrical shape in the main part and conical for the base and the roof, as part of the expansion of the Beggen wastewater treatment plant, for the city of Luxembourg
- Smulders (Eiffage Métal, EIFFAGE) : construction of bridges 2060 (Annemie-Wolff) and 2080 (Lee-Miller) linking Haveneiland, Centrumeiland and Strandeiland, including mixed steel and concrete structures. The production of the steel lattice-work structure is composed of curved tubes
- SPIE Nederland (SPIE) : construction of a new 110 kV high-voltage substation, on behalf of TenneT TSO BV, connecting Windpark Fryslan and potentially other initiatives. The substation will be linked to the Sneek-Bolsward Marnezijl connection, with an underground cable extending to Heerenveen
- SPIE Nederland (SPIE) : construction of a new 380 kV high-voltage substation on the Maasvlakte, on behalf of TenneT TSO BV. This station will contribute to future-proofing the network and meeting the needs of businesses in the region. The new substation, named « Amaliahaven », will be connected to the existing high-voltage grid on the Maasvlakte via a newly built overhead transmission line
- SPIE Nederland (SPIE) : workplace management for UWV, for at least six years, on behalf of Tata Consultancy Services. With over 20,000 employees, UWV is one of the largest government institutions in the Netherlands. This autonomous administrative authority is responsible for managing benefits such as unemployment/sickness and supports job seekers in finding employment
- SPIE Nederland (SPIE) : major renovation and modernization of Sportpark Glanerbrook in Geleen, on behalf of the municipality of Sittard-Geleen. The project includes the construction of a new indoor shop and fitness center, revitalization of the sports hall with upgraded locker rooms and stands, renovation of the existing swimming pool, and renovation and expansion of general indoor spaces and hospitality areas. The outdoor pool will also be renovated, and large technical spaces and infrastructure will be developed to support the potential future operation of a 400-meter ice rink
- SPIE Nederland (SPIE) : management and maintenance of electrical, mechanical, and climate-control systems, along with replacement projects and consulting & implementation of sustainability initiatives, span across 16 buildings totaling 128,000 m². This includes offices, city offices in Amsterdam, and the Weesp Town Hall, ensuring optimized functionality and sustainability in critical municipal facilities
- SPIE Nederland (SPIE) : IMACD patches, cables, and ports, maintenance and operations of MERs/SERs (including air conditioning, UPS, and fire extinguishers), access management, ICT infrastructure projects, LAN/WAN (wireless) and CMDB/patch management administration, on behalf of KPN / UWV
- SPIE Nederland (SPIE) : fiber optic installation in Zwijndrecht including designing, excavating, and installing fiber optic networks for both residential and business connections. This involves setting up connection points, laying main and distribution cables, and connecting homes and businesses to the network, with a focus on minimizing disruption to the environment and adhering to safety and quality standards
- SPIE Nederland (SPIE) : long-term maintenance, monitoring, and reporting on the condition of the assets within the management area of Rijkswaterstaat West-Nederland Noord, covering both the North and South districts. This includes upgrade activities to ensure optimal functionality and compliance with regulations
- SPIE Nederland (SPIE) : supply of various systems in the two high-voltage halls, on behalf of Dura Vermeer / TenneT, including lighting and power installations, access control systems, fire alarm and evacuation systems, data cabling, heating and cooling systems, water installations, sanitation, sewage, and emergency power systems. The intermediate building will house the Central Services Building of the onshore station, serving as a vital hub for operational management and infrastructure integration
- VINCI Construction Grands Projets (VINCI Construction) : design and construction of a 180,000 m3 liquefied natural gas tank (LNG) with a nickel steel inner tank and a post-tensioned concrete outer container. This project falls within the programme to expand the storage capacity and regasification of the GATE (Gas Access To Europe) terminal, based in the port of Rotterdam, by making it possible to supply an additional 4 billion m3 of gas each year. The contract is scheduled for completion by the second half of 2026
- Eiffage Génie Civil (EIFFAGE) : Design-Build contract for a 1.4 km 2x2 lane section in a dense urban area of the E18-E39 motorway linking Gartnerlokka and Kolsdalen, including 12 structures, the reconstruction of 1.5 km of track, as well as the redevelopment of the existing ferry terminal and the installation of electrical and traffic engineering equipment
- Eiffage Polska (EIFFAGE) : Marcelinska apartment blocks in Poznan, including two 144-apartment buildings
- Smulders (Eiffage métal, EIFFAGE) : design, manufacture and supply of 76 transition pieces for Baltic Power, Poland’s first offshore wind farm. The wind farm will have an average annual production capacity of up to 1.2 GW, providing sustainable energy for more than 1.5 million homes. Commissioning is scheduled for 2026. The secondary steels are manufactured at Eiffage Métal’s production plants in Poland and then transported to the United Kingdom for assembly of the transition pieces at Eiffage Métal’s Newcastle site
- Spie Batignolles International (SPIE BATIGNOLLES), 30% / Mota-Engil, 70% : design-construction of the extension of the Lisbon metro red line between São Sebastiao and Alcantara. The contract provides for the construction of approximately 4.1 km of tunnel using the traditional method, 2 Cut & Cover stations, one underground station and one viaduct station. The railway and electromechanical equipment as well as the secondary construction works of the stations and ancillary works are also part of the contract
- Eurovia SK, Eurovia CS et SMS (VINCI Construction) : leader of the consortium, second lot for the Northern bypass of the town of Presov, Slovakia's third-largest city. The project will include the construction of 12 bridges, a 2-km tunnel and 10.2 km of 2x2 road section. Work is scheduled to start in September 2023 and will take around four years to complete
- Eiffage Energía Sistemas (EIFFAGE) : 11 contracts for the construction of solar power plants (Albacete, Seville, Granada, Burgos, Cuenca, Santerém, Guadalajara, Almeria) ranging from 26 MW to 330 MW
- Eiffage Energía Sistemas (EIFFAGE) : construction of a 220 kV high-voltage line in Seville for ENI Plenitude
- Eiffage Energía Sistemas (EIFFAGE) : plant supply and construction for the “Cerrato I” group of 4 wind farms, with a capacity of 140 MW, located in Palencia on behalf of Repsol
- Eiffage Infraestructuras (EIFFAGE) : bulk terminal in the port of Alicante with a fully automated reception, storage, transport and loading system
- VINCI Energies, VINCI Construction (groupe VINCI) : in a consortium with Hitachi Energy (leader), contract for the design-construction of two ground stations for the conversion of electrical energy including the construction and commissioning of all cross-border connections between France and Spain, on behalf of Electricity Interconnection France-Spain (INELFE), the joint venture bringing together operators of the Spanish (Red Electrica) and French (RTE) electricity transmission networks. Located in France and Spain, these stations will transform the alternative current of the electrical networks into direct current. They will be connected via a 400 km cable (including 300 km of submarine cable in the Bay of Biscay), enabling energy exchange between the two countries with a combined capacity of 2 GW. VINCI will be responsible for the design and construction of civil engineering and electrical works of the stations. Their delivery is expected in 2028
- Anoxkaldnes (VEOLIA WATER TECHNOLOGIES) : construction of new wastewater treatment facilities in Kappala, on behalf of NCC. The plant must increase its capacity to meet an expected load of 900,000 population equivalents by 2050, as well as new emission requirements from 2026. Once completed, the plant will feature the largest MBBR (Moving Bed Biofilm Reactor) system in the world, treating 80% of the incoming pollutant load
Switzerland
- Bouygues Bâtiment International (Bouygues Construction) : contract for the demolition-reconstruction of the Acacias residential district in Geneva. This project is an integral part of the transformation plan for the Geneva conurbation. The construction of this project will mark the rebirth of an emblematic district renowned for its dynamism and cultural spaces. With a total surface area of 36,000 m², the district will include 335 apartments ranging from studio to 6-room, a vast tree-lined inner courtyard, 2 floors dedicated to students and 9 retail units on the first floor. The project also incorporates ambitious environmental and energetic objectives, and will benefit from the Minergie ECO label as well as C02-neutral heating production
- Bouygues Bâtiment International (Bouygues Construction) : construction of a new cantonal administrative center in Lucerne to centralize administrative activities and accommodate 1,450 employees. Designed to minimize environmental impact and maximize user well-being, the project incorporates sustainable criteria such as a Swiss wood atrium tower, a district heating connection and photovoltaic panels, thus meeting the requirements of SNBS Gold and Minergie P-ECO certification. The building will also offer public services such as a crèche, police station, restaurants and shops
- Bouygues Bâtiment International (Bouygues Construction) : development of a sustainable, upscale residential neighborhood « Aarerain », in Ittigen. The complex will include 189 homes for up to 400 residents, as well as a crèche and workshops on the first floor, contributing to the liveliness of the district's central square. Designed according to the QEP (Quartier à Énergie Positive) energy standard, the project will produce more energy than it consumes, thanks to the integration of photovoltaic panels on the roofs and façades of the buildings
- Bouygues Bâtiment International (Bouygues Construction) : construction of the Quarz-up multi-purpose tertiary complex in Vernier, combining social innovation and environmental performance. Powered by a district heating network and rooftop solar panels, the site is based on a sustainable energy supply. It also includes an urban farm and greenhouses, fostering links between economic activities and the local community. Thanks to the use of 2,300 m³ of low-carbon concrete, the project reduces its ecological footprint, saving around 440 tonnes of CO2 emissions. By aiming for Minergie and Well Community certifications, it affirms its commitment to the environment and the well-being of its future occupants
- Bouygues Bâtiment International (Bouygues Construction) : residential housing, Rte de Vernier 112 in Vernier
- Bouygues Bâtiment International (Bouygues Construction) : construction of Building B5 of the Kriens Nidfeld project, comprising eight modern buildings and a 16-storey tower, 490 apartments, offices and retail space. The main source of energy for the heating systems is Lake Lucerne. Photovoltaic systems will be installed on the roof
- Bouygues Bâtiment International (Bouygues Construction) : construction of a state-of-the-art manufacturing facility with adjoining office wing in Embrach for Wymed, a company specializing in the manufacture of precision mechanical parts and equipment for the medical industry. The enlarged production area will support the company's growth, while the optimized process layout will enhance productivity
- Bouygues Bâtiment International (Bouygues Construction) : AuPark project, construction of a residential complex in Reinach comprising a total of 42 2-to 5-room rental apartments, specially designed for families and senior citizens. A model of successful urban development, the residential complex comprises three buildings served by the Gruthweg, which also serves as a public footpath for schoolchildren. As a result, the neighborhood will be perfectly connected to the public transport network, thus promoting mobility. The heart of the complex is the outdoor space, which serves both as a meeting place and a habitat for the preservation of biodiversity
- OTV Sud Est (VEOLIA WATER TECHNOLOGIES) : contract for nitrogen treatment on biofilters and micropollutant treatment at the Sierre wastewater treatment plant and its surroundings, based in Noës, with a capacity of 99,000 PE by 2050. This achievement was carried out in partnership with VWTS, particularly for micropollutant treatment using the Ozonia process. The chosen solutions include Biostyr DuoTM for nitrogen treatment and SpidflowTM for dirty water treatment. The advantages of this offer lie in the compactness of the solution and the adaptability of the SpidflowTM process
- Bouygues Bâtiment International (Bouygues Construction) : the new Oriel Hospital, initiated by three ophthalmology institutes, aims to expand and modernize the Saint Pancras hospital. Specialized in eye care, the facility was designed to be flexible to meet future health service needs. It will be able to handle more than one million appointments per year and adapt its infrastructure to the continuous evolutions of research, technologies and medicine
- Bouygues Bâtiment International (Bouygues Construction) : Pentre Awel project, construction of a health and wellness center in Carmarthenshire, Wales. The project will provide world-class medical research and healthcare delivery, while creating 1,800 jobs to help boost the local economy
- Bouygues Bâtiment International (Bouygues Construction) : completion of the first phase of the Cotswolds Designer Outlet village in Gloucestershire. This first phase of work will house a retail and catering space covering some 12,635 m². This major project is expected to generate 300 jobs and make a significant contribution to the region's economic development. The overall project is divided into two phases, and when completed will offer a total surface area of around 17,188 m², featuring over 90 high-end fashion and lifestyle brands
- Colas Ltd (COLAS) : maintenance contract including roadworks for two districts in the city of Chester
- Colas Ltd (COLAS) : roadworks subcontracted by Bouygues UK for the Sustainable Transport Corridor in Harlow, Essex county
- Colas Ltd (COLAS) : road rehabilitation works for Bromsgrove junction on the A38, in Worcestershire county
- Colas Rail Limited (COLAS) : modification and renewal of existing lines for the construction of the new Old Oak Common station in Greater London
- Colas Rail Limited (COLAS) : renewal of tracks, tunnel, construction of Cambridge South and Wixams stations, in the South of the country, as part of the SRSA contract (South Rail System Alliance, including Colas Rail, Network Rail, and AECOM), over a ten-year period
- Colas Rail Limited (COLAS) : network surveillance contract to ensure the safety of passenger and freight trains on over 35,000 kilometers of tracks
Saudi Arabia
- Bouygues Travaux Publics / Bouygues Bâtiment International (Bouygues Construction) : completion of preliminary work on the Shaaran Hotel in the Alula region. The complex will include 38 suites and several facilities: a spa, a kids' club, a sports center and a business center. Ultimately, the site is intended to host international events. The project involves a multitude of technical challenges, including: tunnelling through ancient rock, zero water loss and natural energy management through geological heat transfer
- Colas Arabia Limited Company (COLAS) : roadworks, supply and implementation of colored asphalt in the Wadi Safar Diriyah district, in Riyadh
- Sidem (VEOLIA WATER TECHNOLOGIES) : in consortium with Al Nasr, EPC contract for an independent reverse osmosis water plant with a capacity of 120 MIGD, in Mirfa, Abu Dhabi, on behalf of Emirates Water and Electricity Company (EWEC)
Benin
- Eiffage Énergie Systèmes (EIFFAGE) : design, supply and installation of a 25 MWp solar power plant at Illoulofin in the municipality of Pobè
- Eiffage Énergie Systèmes (EIFFAGE) : Millenium Challenge Account Benin II Project, construction work to connect 4 solar power plants to the SBEE HVB grid (Bohicon) and HVA grid (Natitingou, Parakou, Djougou)
- Eiffage Énergie Systèmes (EIFFAGE) : SBEE’s electricity network extension and densification project (PEDER). The Lot 1 is for the departments of Atlantique, Plateau and Ouémé and the Lot 2 for the departments of Zou and Collines
- Colas Gabon (COLAS) : development of the roadways of Franceville (phase 2, 13 km)
- Colas Gabon (COLAS) : rehabilitation of the Transgabonaise (Nsile-Bifoun section), using the Recycol technique, which relies on a train of machinery to recycle the pavement in a single pass
- Eiffage Génie Civil (EIFFAGE) : construction of 4 university hospitals in the regional capitals (Kindia, Labé, Kankan and N’Zérékoré)
- Bouygues Travaux Publics / Bouygues Bâtiment International (Bouygues Construction) : the project of the Line 1 of Abidjan metro is designed to support the economic and demographic development of the Ivorian capital. Ultimately, it will transport more than 500,000 passengers a day, improving the flow of traffic. With a length of 37 kilometers, Line 1 will follow a natural communication corridor, stretching from the North to the South of the city
- Colas Rail, Ivory Coast (COLAS) : railway works, electrification, high/low currents, and ticketing systems for the construction of Abidjan’s metro line 1
- Eiffage Énergie Systèmes (EIFFAGE) : Ivory Coast Electricity Production Company project
- FRANZETTI CI (SADE) : laying of 14 km of pipes (HDPE Ø 1,200 mm) as part of the reinforcement of the drinking water supply network in the municipalities of Abobo and Yopougon, on behalf of the National Office of Drinking Water (ONEP)
- FRANZETTI CI (SADE) : laying of 30 km of pipes (cast iron Ø 400 and 600 mm) in Kimoukro, as part of the reinforcement of the drinking water supply system from the Bandama River, on behalf of the Ministry of Hydraulics
- FRANZETTI CI (SADE) : diversion of a drinking water network in two districts of Abidjan (Riviera 3 and the Palmeraie) including 2.2 km of pipes (Ø cast 200, 400 and 600 mm), as part of the project to build 3 interchanges in Cocody
- Bouygues Bâtiment International (Bouygues Construction) : construction of the University Hospital Centre of Benguérir, located North of Marrakech. Covering an area of 70,000 m², the hospital will feature 7 operating theatres, 330 beds divided between the various departments and several green spaces. The project is part of the economic development of Benguerir, which is also home to the Mohamed VI University Science and Technology Centre (also built by Bouygues Construction and its subsidiaries)
- Bouygues Bâtiment International (Bouygues Construction) : construction of a complex combining work spaces and housing in the heart of Casablanca's business district. This project is part of the district's development plan to attract Moroccan companies. Featuring 3,000 m² of green space, the complex will be divided into 2 distinct parts: My Way Office, comprising 3 buildings of 8 storeys each, offering 63 office floors; My Way Living, comprising 2 buildings of 16 and 12 storeys, offering 166 residential units. The project integrates eco-responsible materials, enabling it to benefit from HQE (High Environmental Quality) certification
- CTHM (SADE) : laying of 42.4 km of drinking water pipes (ductile iron and Ø 700 mm steel) and construction of the associated civil engineering structures (107 air reliefs, 104 washout, 3 shut-off valves and 1 flow meter) in Dakhla in order to strengthen the drinking water supply, on behalf of the National Office of Electricity and Drinking Water (ONEE)
- CTHM (SADE) : construction of the 10 Mars gallery (2.4 x 2.4 m over a total length of 1.9 km) and its secondary galleries in Casablanca, Lahraouiyine (1.6 x 1.8 m over a total length of 1.1 km) and North Lahraouiyine (2 x 2 m over a total length of 389 m), including the creation of 31 access shafts
- CTHM (SADE) : construction work of the Mohamed VI University gallery in the city of Salé, including 1250 m of ovoid gallery for rainwater and 1250 m for wastewater as well as 53 access shafts
- CTHM (SADE) : laying of 2.8 km of pipes (cast iron Ø 600 and 700 mm) and rehabilitation of 800 m of pipes (Ø 600 and 700 mm) using lining technique in the city of Kenitra, as part of the rehabilitation of the drinking water supply pipes between the Maâmora and Ouled Oujih hydraulic complexes, on behalf of the Régie Autonome de Kénitra (RAK)
- CTHM (SADE) : construction of a discharge outfall for the desalination plant in Sidi Ifni, over 300 m (HDPE Ø 500 mm) including the installation of drain manholes, manholes for diffuser, concrete ballast and connection, on behalf of the National Office of Electricity and Drinking Water (ONEE)
- NGE CONTRACTING (NGE) : construction of a wastewater treatment plant for the factory of the Société des Boissons du Maroc (SBM)
- NGE CONTRACTING (NGE) : sealing works for the TPC using GBA-type concrete separators along the Oum Rbii-Skhour Rhamna highway section
- NGE CONTRACTING (NGE) : water supply pipeline for Moulay Abdellah as part of the mobile desalination project in Jorf Lasfar
- NGE CONTRACTING (NGE) : lot concerning the execution studies and implementation of earthworks and road construction in the logistics free zone of Tanger Med
- NGE CONTRACTING (NGE) : APM Terminals MedPort Tangier, TM2-E expansion project (phase 3), apron
- NGE CONTRACTING (NGE) : works for the construction and operation of the wastewater treatment plant for olive mill wastewater (margines) in the Ain Beida industrial zone
- NGE CONTRACTING (NGE) : flood protection for the Ain Houala road, Oulja-Salé, lot 1 (upstream, development of the bridge for the ONCF and connection to the existing P4008 network)
- NGE CONTRACTING (NGE) : flood protection for the Ain Houala road, Oulja-Salé, lot 2 (section before the ONCF up to the Oued Bouregreg, alternative solution)
- NGE CONTRACTING (NGE) : works for the construction and operation of the wastewater treatment plant for olive mill wastewater (margines) at the Oulad Jamee site
- NGE CONTRACTING (NGE) : civil engineering and hydraulic equipment works package for the ISBL (Inside Battery Limit) mobile desalination project at Jorf Lasfar
- NGE CONTRACTING (NGE) : overburden stripping services using bulldozers
- NGE CONTRACTING (NGE) : Central Axis Program, Mzinda Phosphate Hub (MPH), platforming (phase 2)
- NGE CONTRACTING (NGE) : Wave II, desalination plant in Jorf Lasfar, civil works
- Transinvest (COLAS) : creation of a link road between the towns of Flic en Flac and Pierrefonds, over 4.5 km, including an interchange with two underpasses, three roundabouts, and a hydraulic tunnel
- Eiffage Énergie Systèmes (EIFFAGE) : Senegal Power Compact, modernisation and strengthening of Senelec’s transmission network (9 substations)
- Eiffage Énergie Systèmes (EIFFAGE) : Ferlo, upgrading and extension of MV/LV distribution networks in the towns of Touba, Linguere and Ndioum
- Eiffage Sénégal (EIFFAGE) : undersea cables Herbosch-Kiere, design, manufacture and installation of two 16m-long 225 kV undersea power cables in Dakar, and six 2 km-long 225 kV onshore power cables, between the west and east coasts of the Bay of Dakar
- SADE : installation of 10 km of gravity network (GRP Ø 500 to 1,200 mm), 8 horizontal drillings under structures and road crossings, construction of 265 concrete manholes and 7 pumping stations to ensure the decontamination of the Hann’s bay, located in the South of Dakar, on behalf of the National Office of Sanitation of Senegal (ONAS)
Australia
- Bouygues Bâtiment International (Bouygues Construction) : Microsoft data center SYD05
- Bouygues Bâtiment International (Bouygues Construction) : data center AirTrunk SYD2
- Bouygues Bâtiment International (Bouygues Construction) : extension of the Acute Services Building (ASB) on the Randwick Hospital campus, spread over 5,000 m² and 10 floors. This project aims to create an environment conducive to research, clinical innovation and training. It includes clinical research laboratories, medical prototyping spaces, areas dedicated to biomedical innovation, as well as educational and training facilities
- Seymour Whyte (VINCI CONSTRUCTION) : design and construct contract for the five-kilometre northern section of the M1 Pacific Motorway that will bypass the town of Heatherbrae, as part of an overall project which will extend this motorway by 15 km to address the M1’s missing link between Sydney and Brisbane This project is targeting an ‘Excellent’ Infrastructure Sustainability (IS) Design and As-Constructed Ratings with the Infrastructure Sustainability Council (ISC). A second project, an Alliance-type contract, covers the overall 6.5 km upgrade of Mulgoa Road, in Western Sydney. Mulgoa Road is a key arterial road, with 52,000 car movements daily connecting the Penrith community with other parts of Greater Sydney. The works involve upgrading a section of Mulgoa Road to a six-lane divided road and creating priority public transport lanes as well as corridors dedicated to soft mobility
- Seymour Whyte (VINCI Construction) : in a consortium, Alliance-type contract to modernise Cressbrook dam, in the Toowoomba region (Queensland), around 100 km from Brisbane. The project focuses on a dual objective: to increase the dam’s capacity in order to protect the Toowoomba region from flooding, and to strengthen the infrastructure's climate resilience. Construction works, which will take around two years to complete, include upgrades to access roads, widening of concrete spillway, extensive upgrades to the dam’s filtration system, and raising the dam’s crest height. Moreover, it includes a major environmental scheme, with the recycling of materials for the construction of the dam wall and technical improvements to allow for natural fish migration
- Bouygues Bâtiment International (Bouygues Construction) / Bouygues Travaux Publics : contract to extend the Tung Chung line of the Hong Kong Metro covering the construction of a 1.3 km tunnel and the creation of a new station, Tung Chung West, which will become the new terminus of the line. This westward extension will provide service to a fast-growing district with a constantly rising population, improving mobility for users by linking Hong Kong’s various districts and strengthening connectivity with the outside world in this strategic region
- Bouygues Travaux Publics (Bouygues Construction) : contract for the construction of the new Kwu Tung station on the East Rail Line. This station will be the first in Hong Kong to be built over an existing rail tunnel. It will play an essential role in the development of the new Kwu Tung North district, guaranteeing adequate rail service for the district's current and future residents
- Bouygues Bâtiment International (Bouygues Construction) : design-build of a multi-use complex on the Anderson Road site in Hong Kong. With a total surface area of 40,000 m², this project is designed to support the local community by improving their well-being, through access to healthcare and leisure facilities. The infrastructure will include a sports center comprising an arena, two multi-purpose activity rooms and a common room. A second pole will feature a public library and new social facilities (retirement home, special care center for children, etc.)
- HPD (VEOLIA WATER TECHNOLOGIES) : supply of process equipment for POSCO’s conversion plant from lithium carbonate (LC) to lithium hydroxide monohydrate (LiOH), with a capacity of 25,000 tons per year
- Bouygues Bâtiment International (Bouygues Construction) : ePLDT data center CP15
- Bouygues Bâtiment International (Bouygues Construction) : ePLDT data center CP03
- Colas Rail Philippines (COLAS) : design, supply, installation, testing, and commissioning of railway tracks and overhead contact systems for the extension of the NSCR line (North South Commuter Railway) in Manila
- Bouygues Bâtiment International (Bouygues Construction) : construction of a residential building at 800 Bukit Timah, comprising two 24-storey blocks for 408 residential apartments, a landscaped terrace, shared basement parking and communal facilities
- VSL (Bouygues Construction) : DE160 Viaduct segment
Canada
- Construction Demathieu Bard Inc. (DEMATHIEU-BARD) : contract for the repair of various structures located in the territory of the Metropolitan Community of the North sector of Montreal
- Construction Demathieu Bard Inc. (DEMATHIEU-BARD) : contract for the repair of various structures located in the territory of the Metropolitan Community of the South sector of Montreal
- Construction Demathieu Bard Inc. (DEMATHIEU-BARD) : securing work on the Papineau-Leblanc bridge, located on the A19, above the Prairies River, in the cities of Montreal and Laval (Quebec). This strategic bridge is used by 56,000 vehicles every day. The operation includes the reinforcement and replacement of the bridge's internal stays, the installation of a marina on the Laval shore for maritime works, the reinforcement of the slabs, webs, diaphragms, and stiffeners inside the caissons, as well as the reinforcement of the median strip and pylons for the installation of 16 new stays
- Construction Demathieu Bard Inc. (DEMATHIEU-BARD) : concrete pavement repair on Highway 15 in Saint-Jérôme, North of Montreal (Quebec). The project includes concrete pavement repair, asphalt pavement coating, and pavement marking, while ensuring the maintenance of traffic flow
- Construction Demathieu Bard Inc. (DEMATHIEU-BARD) : construction of a new bridge to replace the 55-year-old Île-aux-Tourtes bridge. It was built north of the existing bridge, connecting Vaudreuil-Dorion to Senneville. The new structure will consist of two independent superstructures, the east and west approaches of 2,000 meters each, both comprising three-lane corridors for vehicle traffic, with shoulders, one of which is designed for bus use, and a multipurpose path for pedestrians and cyclists
- Groupe Colas Quebec (COLAS) : redevelopment of boulevard Guillaume-Couture in Lévis, near Quebec City, to create four lanes for individual vehicles, two lanes for public transport and carpooling, and two bike paths
- HPD (VEOLIA WATER TECHNOLOGIES) : supply of process equipment for the evaporation/crystallization of lithium hydroxide monohydrate and sodium sulfate for the production plant of Nemaska Lithium Inc. (Canada's first integrated lithium hydroxide producer), in Bécancour, Quebec. This plant will transform spodumene concentrate from the Whabouchi mine into high-purity lithium hydroxide monohydrate for automotive batteries. This project is driven by the shortage of lithium salts for the manufacture of battery cathodes, as well as the significant global shift to electric vehicles
- Lafrentz (COLAS) : multi-year contract for road marking in British Columbia
- The Miller Group (COLAS) : maintenance contract for road maintenance, snow removal and patrol operations in Ontario
- The Miller Group (COLAS) : construction of a crossing on Highway 404 between the cities of Richmond Hill and Markham, Ontario. The project includes preparatory works (earthworks, grading), implementation of asphalt and construction of two bridges
- The Miller Group (COLAS) : rehabilitation project of Highway 401 over approximately 8 km, including the renovation of four structures and asphalt paving
- The Miller Group (COLAS) : preliminary work for the widening of Highway 401, involving the demolition of two existing bridges, the construction of new overpasses, and road resurfacing
- NPA (COLAS) : creation of an additional lane on Highway 40:42, over a length of 10 km, with the construction of a bridge and a roundabout
- Spie Batignolles Canada (SPIE BATIGNOLLES), 33.33% / Pomerleau / EBC : construction of the extension of the Montreal metro blue line between Saint Michel station and Anjou. The contract provides for the construction of a single-tube tunnel of approximately 5 km with a hard rock TBM and 470 m at the cutter, the excavation of five stations, one of which is partially underground, and various ancillary works
- Spie Batignolles Canada (SPIE BATIGNOLLES), 25% / Pomerleau / EBC : Stanley Park water supply tunnel in Vancouver including the construction of three shafts and a 1,353 m tunnel excavated at the cutter in a dense and protected urban environment. The contract also provides for the supply and installation of a 2,600 mm metal pipe and the civil engineering and secondary works of the connection works to the existing network
- Standard General (COLAS) : rehabilitation of the roads in the Baturyn neighborhood, in Edmonton
- Bouygues Travaux Publics (Bouygues Construction) : the Potomac River Tunnel involves digging a tunnel at a depth of around 30 metres using two tunnel boring machines (TBMs). It will capture and treat stormwater and wastewater, helping to protect biodiversity by reducing contamination by bacteria in the water
- Colaska (COLAS) : rehabilitation of three taxiways at Anchorage International Airport, Alaska
- Colaska (COLAS) : rehabilitation of runways and construction of a new taxiway at Homer Airport, Alaska
- Reeves Construction (COLAS) : road rehabilitation and jacking of eight bridges on Interstate 26 in Newberry County, South Carolina
- Reeves Construction (COLAS) : reconstruction and widening of Highway 181 in Mississippi County, Arkansas
- Reeves Construction (COLAS) : rehabilitation of a section of Interstate 26, including pavement work and bridge repair, in Newberry, South Carolina
- Sully-Miller Contracting Company (COLAS) : renovation of a road section in San Bernardino, California, including milling and pavement repair, replacement of concrete barriers, guardrails, and various electrical works
- TECHNOPREF Industries Inc. (DEMATHIEU-BARD) : I-64, expansion of the Hampton Roads Bridge-Tunnel (HRBT) in Norfolk, supply of precast concrete segments. The contract includes the manufacture of 2,400 rings (21,600 segments), with a diameter of 41’-6’’, for the construction of two tunnels, each 2.4 km long, for highway traffic
- TECHNOPREF Industries Inc. (DEMATHIEU-BARD) : RiverRenew project in Alexandria (Virginia), manufacturing and delivery of precast concrete segments. The contract includes the manufacturing of 2,539 concrete rings (15,234 segments), with a diameter of 12’-0’’, for the construction of a 3.482 km long tunnel intended for wastewater
Brazil
- Cobra IS (groupe VINCI) : three contracts for almost 1,950 km of high voltage transmission lines including a public-private partnership contract for the conception, construction and operation of a 349 km high-voltage lines in Minas Gerais State and the extension of two existing substations in Minas Gerais State (lot 3). The associated investment is €150m in the region. The other two design-build contracts cover nearly 1,600 km of electrical transmission lines and associated substations: Lot 1 covers a 1,092 km transmission line and three new substations in the states of Minas Gerais and Bahia while Lot 7 covers 507 km and a new substation in the states of Minas Gerais and Rio de Janeiro
- Bouygues Bâtiment International (Bouygues Construction) : construction of a Grand Hyatt hotel, located right on the famous “Seven Miles Beach”. The hotel will offer a wide variety of luxury services and feature 381 hotel rooms, as well as swimming pools, restaurants, spa and indoor/outdoor conference spaces
- TSO-NGE Mexico SA de CV (NGE) : maintenance of line 12 of the Mexico City metro, rail systems
- TSO-NGE Mexico SA de CV (NGE) : Maya Train, section 2, railway works operations using tamping and ballast regulating machines, deploying TSO heavy equipment