14 entreprises adhérentes
Soletanche Bachy

 http://www.soletanche-bachy.com

Nos chiffres clés

Total revenue (2006) : €1,075m  
International revenue : €726m

Staff : 4,000

Chairman and Chief Executive Officer
Jean-Pierre LAMOURE

6, rue de Watford
BP 511
92005 Nanterre
Tél. : + 33 1 47 76 42 62
Fax : + 33 1 47 73 98 21



     Dubai Palm Trunk Channel : Construction of a 2.4km long canal on
                        Palm Island (United Arab Emirates)

 

Profil de l'entreprise

Ground technologies and civil engineering

For more than 50 years, Soletanche Bachy has based its success on service to its clients:

  • at the leading edge of design and construction in ground technologies;
  • with equipment and processes that have won a record number of scientific awards (twelve innovation prizes awarded by the French Federation of Civil Engineering Contractors out of 16 competitions);
  • through our high-tech subsidiaries in geotechnical, tunnelling, environment and metrology services, mechanical manufactures;
  • on projects of international renown in more than 100 countries thanks to our rapid mobilisation of human and equipment resources of quality, quantity and diversity without equal in our speciality; our capacity gives an unparalleled security to our clients should any unforeseeable circumstances or conditions arise.

 

Domaines d'activité

    - Geophysics, investigation, measurements, interpretation
    - Drilling, pumping, dewatering, drainage
    - Consolidation, compaction, vibroflotation, stone columns, soil mixing
    - Grouting, jet grouting, compensation grouting, ground freezing
    - Micropiles, piles, barrettes
    - Cast in situ and precast diaphragm walls, cut-off walls, anchors, tiebacks, struts, sheet piles
    - Soil remediation, toxic waste stabilization/solidification
    - Monitoring and repair of civil engineering structures
    - Civil engineering: car parks, cut & covers, tunnels, storage tanks and sewerage, harbour works

 

In order to ensure the best possible service to its clients, Soletanche Bachy pursues a continuous programme of improvement. The programme addresses internal procedures and working methods as well as the techniques and machinery used on site. This activity falls within the scope of our ISO 9001 certification and relies, in particular, on internal research and development projects with an emphasis on the preservation of the environment :

- protection of the ground and ground water by the development of non-polluting concretes, grouts and excavation muds,
- construction of machinery requiring little space, creating very little noise and suited to urban sites,
- instrumentation of sites to allow continuous monitoring,
- conformance with standards relating to spoil,
- consideration of environmental objectives for the design of underground structures [e.g. storm tank PIBOP giving a small footprint on the surface, 1st prize FNTP Innovation Award 2001]..

 

Présence à l'étranger

The Group is present in more than 50 countries, especially in Europe, South East Asia and the Americas. Our international subsidiaries rely on locally recruited management as well as on expatriate specialists.
Our consistent training policy is complemented by a modern system of real-time communication and data transfer and encourages continuous cross-fertilisation and know-how transfer.

 

Réalisations récentes

EUROPE
  • France
    - Isseane project (Issy les Moulineaux) : « Clean » waste incineration and recycling plant to process household waste from 1 million houses in Western Paris (D-wall 80,000m2, 800 load bearing piles, grout curtain, ground anchors)
    - RER C (Ile-de-France) : Soil consolidation by concrete grouting under the existing rail track
    - Valenton VL10 (Ile-de-France) : Tunnel of 2km long and diameter 4m
    - Tunnel (Besançon) : D-wall, nailed wall, earth moving and civil engineering
    - Parking Perrinon (Martinique) : Diaphragm walls for an underground car park at Fort-de-France
  • Monaco
    - The Millenium : Excavation of 50mx30m and 14m deep, representing 20,000m3 of earthworks and 2,000m2 of shotcrete
  • Rumania
    - Tunnel construction in Cluj (Transylvania), for drinking water and wastewater networks
  • Spain
    - Barcelona Metro : Instrumentation for real time measurements of the ground movements during the construction of a new metro line
  • United Kingdom
    - Waste to Energy Plant (Allington) : Civil engineering and diaphragm walls for a waste to energy plant
ASIA
  • China
    - Wuhan Bridge : Deep diaphragm wall (70m) for the bridge piers over the “blue river” located at 1,000km west of Shanghai HongKong
    - Sky Plaza : Deep excavation with diaphragm wall for a real estate development complex
    - AIG Tower, 1 Connaught Road : Piles for tower foundations ASD Contract N° SS H362 : Diaphragm wall and barrette works for Stanley Complex
    - Tai Wai Station : Large diameter bored piles for the construction of a Public Transport InterchangeKorea• Seomyeon Daelim Apartment (Busan): Diaphragm walls, barrettes, piles for building foundations
  • Singapore
    - Church Street : Underpinning works with 85 pre-bored piles of the foundations of an existing building (30 floors)
    - Circle Line, C823 LTA Contract : Diaphragm wall for 3 stations and a cut and cover section for extension of Metro line
CENTRAL AMERICA
  • Mexico
    - La Ventosa : Foundations of 75 wind mills
MIDDLE EAST
  • United Arab Emirates
    - Dubai Palm Trunk Channel : Ground improvement, diaphragm wall, earthmovings, civil works for the construction of a 2.4km long canal on Palm Island
OCEANIA
  • Fiji Islands
    - King’s Warf : Jet grouting for the repair of a harbour quay wall


    Autres entreprises

BOUYGUES CONSTRUCTION | COLASEUROVIA |  SADE 
SPIE
 | SPIE BATIGNOLLES
VINCI CONCESSIONS | VINCI CONSTRUCTION